Exposed Pipe Report
Foreign Line Crossing · Daylight & Backfill Record
EPR·NEW OPEN Not yet saved …
1Identification▸

Exposed (foreign) line

New / crossing line

Location

Establishing shot
◫Pipe Map▸

Shows this dig on the pipeline alignment. Capture GPS above and the pin lands on the hole. Open full map ↗

2Damage Prevention & Locate▸

One-call must be open and unexpired through backfill. Hand/vac dig only inside the tolerance zone.

3Hydrovac Exposure▸

Record pressure and standoff — high-pressure water is what damages coating.

Before
Exposed
4Coating Inspection▸
5Coating Repair▸

OQ-qualified repair only. Surface temp must be above dew point for FBE/epoxy. Record batch numbers.

Repair — before
Repair — after
6Secure the Hole▸
Covered / secured
7Crossing Work▸
Crossing
8Backfill & Closeout▸

Line owner approves before anything is covered. That sign-off is the record that protects you.

Backfill
9Signatures▸
✎Visit Log▸