Tortuga Safety
Exposed Pipe Report
Foreign Line Crossing · Daylight & Backfill Record
EPR·NEW OPEN Not yet saved
1Identification

Exposed (foreign) line

New / crossing line

Location

Establishing shot
Pipe Map

Shows this dig on the pipeline alignment. Capture GPS above and the pin lands on the hole. Open full map ↗

2Damage Prevention & Locate

One-call must be open and unexpired through backfill. Hand/vac dig only inside the tolerance zone.

3Hydrovac Exposure

Record pressure and standoff — high-pressure water is what damages coating.

Before
Exposed
4Coating Inspection
5Coating Repair

OQ-qualified repair only. Surface temp must be above dew point for FBE/epoxy. Record batch numbers.

Repair — before
Repair — after
6Secure the Hole
Covered / secured
7Crossing Work
Crossing
8Backfill & Closeout

Line owner approves before anything is covered. That sign-off is the record that protects you.

Backfill
9Signatures
Visit Log