PRIOR PROPER PLANNING · 7 P's
GAUGE TICKET
⚠ PENDING
Crude Oil Tank Gauge / Run Ticket — Form 2

Tank Gauging
& Custody Transfer

Opening + closing gauges, three-level temperature, gravity, BS&W, seals, LACT meter, and Getty box documentation.
Header
Auto-captured at form open
Required
Both names required
Required
Required
Required
Required
From tank strapping table — used to estimate gross volume
Opening Gauge
All three values required
OPENING TOTAL IN
Free water below the oil cut, if any
Closing Gauge
All three values required
CLOSING TOTAL IN
RUN INCHES (OPEN − CLOSE)
Photo required
Temperature
All three temperatures required
AVG TEMP °F
Gravity & BS&W
Required
Required
From ASTM D1250 / API MPMS Ch. 11.1 tables
Required
Pick a sample method
LACT Meter (if applicable)
Volume Summary
Required
Apply CTL from ASTM D1250
Required
Getty Box & Documentation
Required
Notes & Sign-Off
Sign with finger
Signature required
Operator / Driver / Witness